** Paul & Anthony Punch List
Status:
New
Priority:
Medium
Assignee:
-
Category:
-
Start date:
01/17/2026
Due date:
% Done:
0%
Estimated time:
Description
- KP Septic Issue
- Work w/ Wyatt - the coin operated dryer working - once working, will be moved to SJ.
- Finish drywall/viking grill removal per Fire Marshall Request
- Drywall in kitchen and allow door to unlatch at pool. Drill Lock if needed
- Put in 2nd Cabinet into PSS-200 - 30" space
- PIP PTAC - Bedroom Unit Switch Out with Wired System.
- cut out - mh12 - AC Unit - add outlet to allow either heater or window unit.
- Finish Timber / Marine Rope Fencing - PSS BBQ Area
DC Stuff:
Oven / Heater hookup - 2 valve boxes
Get AC hookup.
Finish Drywall, Flooring