PSS #77
Updated by Sieu Ngo 9 days ago
# KP Septic Issue
# Work w/ Wyatt - the coin operated dryer working - once working, will be moved to SJ.
# Finish drywall/viking grill removal per Fire Marshall Request
# Put in 2nd Cabinet into PSS-200 - 30" space
# PIP PTAC - Bedroom Unit Switch Out Switchout with Wired System.
# cut out - mh12 - AC Unit - add outlet to allow either heater or window unit.
# Finish Timber / Marine Rope Fencing - PSS BBQ Area
# Work w/ Wyatt - the coin operated dryer working - once working, will be moved to SJ.
# Finish drywall/viking grill removal per Fire Marshall Request
# Put in 2nd Cabinet into PSS-200 - 30" space
# PIP PTAC - Bedroom Unit Switch Out Switchout with Wired System.
# cut out - mh12 - AC Unit - add outlet to allow either heater or window unit.
# Finish Timber / Marine Rope Fencing - PSS BBQ Area