PSS #77

Updated by Sieu Ngo 6 days ago

# KP Septic Issue
# Work w/ Wyatt - the coin operated dryer working - once working, will be moved to SJ.
# Finish drywall/viking grill removal per Fire Marshall Request
# Drywall in kitchen and allow door to unlatch at pool. Drill Lock if needed
#
Put in 2nd Cabinet into PSS-200 - 30" space
# PIP PTAC - Bedroom Unit Switch Out with Wired System.
# cut out - mh12 - AC Unit - add outlet to allow either heater or window unit.
# Finish Timber / Marine Rope Fencing - PSS BBQ Area

DC Stuff:
Oven / Heater hookup - 2 valve boxes
Get AC hookup.
Finish Drywall, Flooring