Project

General

Profile

PSS #84

Updated by Sieu Ngo 18 days ago

# Roof Leak - above 208
# roofing DC 200
# Hose Connection - +3/4 3/4 crimp ring+ - check PSS ring
# 109 - paint & finish
# Brandy - arrange for rocks to be moved from BI to DC
# 123 - need to secure counter and piping underneath
# take care of weeds - +need need weed eater+ eater - the one there has no battery
# Dryer from SJ - that is now at DC - need key for coinbox
# additional parking curb - rebuild cracked, 1 crooked, 2 sets up front, 1 set in back - +wheelbarrow+ , wheelbarrow, releaser..
# 200 - get move in ready ... paint, bathroom, + doors+ , doors,
# removing fence stakes - +need jack+ need jack
# drywall sag - 2nd floor balcony ceiling - need +drywall+ ?.. ceiling.. also better cable managment
# Main Sign - need better lights.
# Secure corner post and Put up No Semi Truck sign - need screws
# put in sink in laundry room - need faucets, base
# Remove curbing, old staircase on Short Side - jackhammer
# Clean up the bar area - organize what no longer belongs
# since SJ has had better luck w/ selling TV's at full price, lets get 2 or 3 up there

Waterproof the back circuit by L2 that Ben installed w/out permission
Move swamp cooler to back of building behind bar
Main sign - doesn't light up at night, looks terrible after Ben/Art tried 4 different times, including putting my extra bright lightbulbs.. will eventually have to resolve.

Figure out where the hell joey cut the wire that stopped downstairs light from working

Old Notes
# DC THNN wire #10 for lines installed in back

Back