MHI #111

Roof Coating Project - Elastomeric

Added by Sieu Ngo 30 days ago. Updated 25 days ago.

Status:
New
Priority:
Medium
Assignee:
-
Category:
-
Start date:
05/16/2026
Due date:
% Done:

0%

Estimated time:

Description

MH -
Batch 1: 22 buckets
Batch 2: 21 buckets (3 were yellow)
Left after 2d coat: 6.5 Buckets .. = 36.5 buckets used for all of MH.
MH10+porch, 4 buckets for 2 coats

DC - with plastic
3 coats: 8.5 buckets

Batch 3: 20 buckets, 2 left in Yarnell=18 to DC
Brandy reported 11.5 left + 8.5 (DC roof) =29 buckets. But 2 were brought from MH that were yellow. But w/ 2 left in phx, all equals.